DESIGN/BUILD
The design/build process is a very efficient and cost effective method of undertaking a new project. Tasks can be completed concurrently versus the traditional design-bid-build method that has each task running consecutively. By compressing the schedule from the first discussion through project turn-over, reduced costs can be realized with the design/build approach.
Since 1996, Carl Walker Construction has successfully completed over 45 new design/build parking garages. We identify the precise parking capacity needs for the client, determine all costs, and outline a full scope of work for every new parking garage project. Our projects include a fast-track schedule, high durability and quality standards and an expert management team.
CWC has the resources, capabilities, and experience to complete any type of parking garage design and construction of quality, providing a single-source solution for optimal results.
At CWC, we are BUILDING EXCELLENCE AT EVERY LEVEL.
Capabilities Include:
- Precast Concrete
- Steel Frame
- Cast in Place
- Horizontal/vertical expansions
View our timelapse video of the 350 Oliver project